Equipment

Facilities and Equipment

 

  • 116 axles bogie including:
  • 68 axles Goldhofer Germany (2005-2011) (7+7+7+7+6+6+5+5+4+4+3+3+2+2)

Ability to side by side and split version coupling

  • 20 axles Goldhofer Germany (1998) (5+5+5+5)
  • 28 axles Commeto Italy (1994) (5+5+5+5+4+4)
  • 10 nos. heavy prime movers/trucks (MACK) up to 600 HP
  • 4 nos. heavy prime movers/trucks (VOLVO) up to 600 HP
  • 8 nos. Low- bed trailers (5,7,11 axles) and various kind of normal trailers
  • 10000 Sq. m. Terminal Including repair shop and parking for bogies and heavy prime movers
  • 5000 Sq. m. Terminal Including repair shop form low-bed and normal trailers
  • Loading and Unloading equipment such as: hydraulic jacks with 200 tons capacity, H Beam, timbers,